Challenge
To ensure the delivery of the FPSO topsides on time.
Scope
Compass Energy was requested by Petrofac to act as their client’s representative during the construction of the TEG at a shipyard in Batam.
Benefit
The topsides were delivered on schedule to be integrated with the FPSO at a shipyard in Singapore.

