Challenge
To build a multi-purpose Jack Up Barge for offshore windmill installation. The Jack Up Barge is equipped with a 1000 ton deck crane.
Scope
Review of engineering drawings and full management of construction by shipyard as owner representative.
Benefit
High quality construction of Jack Up Barge.

